top of page

Export Flexible Flowline

5.jpg

Hydrocarbons are transferred from the MOPU to the FSO by Export Flexible Flowline which is submerged at the seabed with ballast collars for bottom stability and with a provision of a Lazy S arrangement at the FSO end to allow for the tanker movements. Emergency Release Coupling is installed on the Tanker end for Safety reasons and to prevent any Oil Pollution in case of an emergency disconnection.

​

Flexible Flowline Specifications:

  • Size 6 inch

  • Pressure Range Upto 120 Bar

  • Fluid Temperature Upto 80 Deg Cel

 

Installation is carried out by an AHTS and is fast to deploy and retrieve with minimum installation and handling equipment required in the field.

​

Grander Energy and its team can project manage the entire solution for its clients.

Final_GranderEnergy_NoBG.png
Contact Us

Singapore                                    United Arab Emirates

Grander Energy Pte. Ltd.               Grander Energy FZCO

3 Temasek Avenue                         30219-001 IFZA Business Park

Centennial Tower Level #18-01    DDP A1-3641379065

Singapore 039190                         Dubai, United Arab Emirates

+65 6751 1690

Copyright © 2021 Grander Energy ®

bottom of page